Sole accredited designer, supplier and installer of the TRM Piling System throughout Southern Africa
A proud partner of Tiroler Rohre GmbH: Fast. Simple. Safe.
TRM Piling offers full turnkey design, supply and installation of the ductile-iron driven piling system by Tiroler Rohre GmbH.
- CIDB grading
- 7CE
- B-BBEE
- Level 1
- Registration
- 2016/525648/07
- Material partner
- Tiroler Rohre GmbH, Austria
- Approval
- ETA-07/0169European Technical Assessment, CE marked
- Since 1986
- Tiroler Rohre GmbH – supplying ductile driven piles for deep foundations since 1986.
01System
The TRM Piling System
Ductile iron pile sections in 5 m lengths, driven by a hydraulic hammer on an excavator. Each pile section plugs into the socket of the one below until the pile meets its driving termination criterion.
Load transfer plate
After driving, the pile is cut to the exact cut-off level and the pile core is filled with cement mortar. After pile head trimming, the load transfer plate is placed on the pile head. This prevents punching shear into the pile cap.
Pile section, 5 m
Ductile iron pile section, 5 m long. Available as TRM 118 (118 mm outside diameter, 6 mm wall) or TRM 170 (170 mm outside diameter, 9 mm wall). Pile sections are added until the pile meets its driving termination criterion.
Plug&Drive® socket and spigot
The tapered spigot of each pile section plugs into the socket of the one below. The hammer's impact locks the joint by friction, rigid and torsionally stiff. No welding, no special tools.
Pile shoe
Non-grouted shoe, flush with the pile section: a flat, closed end. Driven to rock or very dense soil; the load goes into the ground in end bearing.
02Compare
Comparing the construction sequence and installation of TRM ductile prefabricated piles with conventional concrete bored piles.
TRM vs Conventional bored pile
TRM driven pile
Excavator with hydraulic hammer
- Mobilisation / set-out, Day 1. Required
- Drive piles to set, Days 2 to 5. Primary install, 15 piles/day
- Grout / core infill, Days 2 to 5. Progressive
- Pile-head trimming, Days 2 to 5. Included
- Records / QA / handover, Days 2 to 5. Progressive
- Foundation release, milestone, day 5
Bored / CFA pile
Piling rig, service crane and casings
- Mobilisation / set-out, Day 1. Required
- Bore / auger pile shafts, Days 2 to 11. Open bore, 5 piles/day
- Temporary casing / bore support, Days 2 to 11. As required
- Dewatering / groundwater control, Days 2 to 11. As required
- Spoil load / cart / dispose, Days 2 to 11. With drilling
- Reinforcement cages, Days 2 to 11. Procure / fix / install
- Bulk concrete placement, Days 2 to 11. Pump / place
- Cure / strength hold point, Days 12 to 18. 7-day allowance
- Pile-head trim / break-down, Days 19 to 20. Separate activity
- PIT / load test / reporting, Days 21 to 22. Where required
- Foundation release, milestone, day 22
TRM driven pile: one pile
- The hammer drives the pile section. No spoil: the soil is displaced
- Next pile section plugs into the socket (Plug&Drive). No welding
- Driving continues, 5 m at a time
- Third section plugged in
- Driven to the solid load-bearing stratum
- Pile cut to level; the offcut starts the next pile
- Concrete truck fills the pile section with cement mortar directly through its chute
- Load transfer plate fitted. Ready for the pilecap
Bored / CFA pile: one pile
- Temporary casing set in the top of the hole
- Auger bores to the solid stratum. Spoil piles up beside the hole
- Base of the hole cleaned
- Service crane lowers the reinforcement cage
- Concrete placed by tremie
- Casing pulled
- Concrete cures, then the pile is integrity tested (about 7 days)
- Head trimmed back to cut-off level. Ready for the pilecap
Key differences
Efficient load capacity
A 170 mm TRM pile can carry the same load as a 500 mm diameter bored pile.
Faster and more efficient
TRM Plug&Drive pile sections couple together without any welding, for up to 250 linear metres of pile per rig per day, depending on pile diameter and soil. Once installed and the driving set is verified, the pile is cut to level, so pilecap construction and steel fixing can follow straight away.
Easier on site
Light, commercially available plant: a 30-ton excavator with a hydraulic hammer. No spoil is generated, because the soil is displaced. Vibration is minimal, and piles can be installed as close as 40 cm from existing buildings and foundations.
Lower cost
No large, expensive piling rig, no cost of carting spoil away and no waste: the trimmed cut-off starts the next pile.
| Conventional bored / CFA pile | TRM driven pile |
|---|---|
| Large piling rig and service crane: mobilise and establish | 30-ton excavator with hydraulic hammer |
| Auger / bore out the pile shaft | Pile driven in; the soil is displaced |
| Temporary casing or support fluid to hold the shaft open | Not required |
| Keep the open pile hole free of water | Not required |
| Spoil handling, carting and disposal | None: no spoil |
| Fabricate, lift and place the reinforcement cage | Not required: the ductile iron pile section is the pile |
| Mass concrete placed by tremie into the shaft | Pile section filled with mortar directly from the truck |
| Concrete curing (about 7 days) | Not required: pilecaps start immediately |
| Integrity testing of the cast shaft | Not applicable: factory-made pile sections |
| Load tests on selected piles | Capacity shown by driving resistance on every pile |
| Break back over-pour and trim the pile head | Cut to level as installed; the offcut starts the next pile |
| Production: slower, with casing, cage and concrete for every pile | Up to 250 m of pile per rig per day, by diameter and soil |
03Applications
TRM pile applications
Residential buildings Commercial & multi-storey buildings Industrial buildings & warehouses Data centres Mining & process plants Bridges (abutments & piers) Power & transmission Silos & tall structures Solar arrays (PV & CSP) Slope stabilisation Soil nailing Uplift / buoyancy protection Underpinning & retrofit Next to existing structures Retaining walls & excavation support Noise barrier walls Flood protection barriers
04Projects
Recent TRM Projects

Pretoria East, Gauteng

Bela-Bela, Limpopo

Lynnwood, Gauteng

Delmas, Mpumalanga

Rustenburg, North West

Amanzimtoti, KwaZulu-Natal

Bronkhorstspruit, Gauteng

Mkhondo, Mpumalanga

Krugersdorp, Gauteng

Meyerton, Gauteng

Ga-Rankuwa, Gauteng

Northcliff, Gauteng

Gqeberha, Eastern Cape

Gqeberha, Eastern Cape

Mahamba, Eswatini
05Resources
Technical documents
Data sheets, certificates, load tests and driving records. Request a document and we will send it.
Pile section dimensions, cross-section capacities and design recommendations.
06About
TRM Piling (Pty) Ltd
TRM Piling (Pty) Ltd is the sole accredited designer, supplier and installer of the TRM Piling System throughout Southern Africa. We offer turnkey pile design, supply and installation of the TRM Piling System.
The TRM pile is made by Tiroler Rohre GmbH in Hall in Tirol, Austria.
- Company
- TRM Piling (Pty) Ltd
- Accreditation
- Sole accredited designer, supplier and installer of the TRM Piling System throughout Southern Africa
- Material partner
- Tiroler Rohre GmbH, Austria
- Registration no.
- 2016/525648/07
- CIDB grading
- 7CE
- B-BBEE
- Level 1
- Location
- Southern Africa

07Contact
Talk to us.
Send us the site information, pile and/or column loads and the geotechnical report, and we'll gladly come back to you with a TRM ductile pile proposal and preliminary pile design for your project.