Skip to content
Piling
Contact us
Piling

Sole accredited designer, supplier and installer of the TRM Piling System throughout Southern Africa

A proud partner of Tiroler Rohre GmbH: Fast. Simple. Safe.

TRM Piling offers full turnkey design, supply and installation of the ductile-iron driven piling system by Tiroler Rohre GmbH.

CIDB grading
7CE
B-BBEE
Level 1
Registration
2016/525648/07
Material partner
Tiroler Rohre GmbH, Austria
Approval
ETA-07/0169European Technical Assessment, CE marked
Since 1986
Tiroler Rohre GmbH – supplying ductile driven piles for deep foundations since 1986.

01System

The TRM Piling System

Ductile iron pile sections in 5 m lengths, driven by a hydraulic hammer on an excavator. Each pile section plugs into the socket of the one below until the pile meets its driving termination criterion.

Pile type
  1. Load transfer plate

    After driving, the pile is cut to the exact cut-off level and the pile core is filled with cement mortar. After pile head trimming, the load transfer plate is placed on the pile head. This prevents punching shear into the pile cap.

  2. Pile section, 5 m

    Ductile iron pile section, 5 m long. Available as TRM 118 (118 mm outside diameter, 6 mm wall) or TRM 170 (170 mm outside diameter, 9 mm wall). Pile sections are added until the pile meets its driving termination criterion.

  3. Plug&Drive® socket and spigot

    The tapered spigot of each pile section plugs into the socket of the one below. The hammer's impact locks the joint by friction, rigid and torsionally stiff. No welding, no special tools.

  4. Pile shoe

    Non-grouted shoe, flush with the pile section: a flat, closed end. Driven to rock or very dense soil; the load goes into the ground in end bearing.

02Compare

Comparing the construction sequence and installation of TRM ductile prefabricated piles with conventional concrete bored piles.

TRM vs Conventional bored pile

TRM driven pile

Excavator with hydraulic hammer

26 m slab18 m
  1. Mobilisation / set-out, Day 1. Required
  2. Drive piles to set, Days 2 to 5. Primary install, 15 piles/day
  3. Grout / core infill, Days 2 to 5. Progressive
  4. Pile-head trimming, Days 2 to 5. Included
  5. Records / QA / handover, Days 2 to 5. Progressive
  6. Foundation release, milestone, day 5

Bored / CFA pile

Piling rig, service crane and casings

26 m slab18 m
  1. Mobilisation / set-out, Day 1. Required
  2. Bore / auger pile shafts, Days 2 to 11. Open bore, 5 piles/day
  3. Temporary casing / bore support, Days 2 to 11. As required
  4. Dewatering / groundwater control, Days 2 to 11. As required
  5. Spoil load / cart / dispose, Days 2 to 11. With drilling
  6. Reinforcement cages, Days 2 to 11. Procure / fix / install
  7. Bulk concrete placement, Days 2 to 11. Pump / place
  8. Cure / strength hold point, Days 12 to 18. 7-day allowance
  9. Pile-head trim / break-down, Days 19 to 20. Separate activity
  10. PIT / load test / reporting, Days 21 to 22. Where required
  11. Foundation release, milestone, day 22

TRM driven pile: one pile

  1. The hammer drives the pile section. No spoil: the soil is displaced
  2. Next pile section plugs into the socket (Plug&Drive). No welding
  3. Driving continues, 5 m at a time
  4. Third section plugged in
  5. Driven to the solid load-bearing stratum
  6. Pile cut to level; the offcut starts the next pile
  7. Concrete truck fills the pile section with cement mortar directly through its chute
  8. Load transfer plate fitted. Ready for the pilecap

Bored / CFA pile: one pile

  1. Temporary casing set in the top of the hole
  2. Auger bores to the solid stratum. Spoil piles up beside the hole
  3. Base of the hole cleaned
  4. Service crane lowers the reinforcement cage
  5. Concrete placed by tremie
  6. Casing pulled
  7. Concrete cures, then the pile is integrity tested (about 7 days)
  8. Head trimmed back to cut-off level. Ready for the pilecap

Key differences

  • Efficient load capacity

    A 170 mm TRM pile can carry the same load as a 500 mm diameter bored pile.

  • Faster and more efficient

    TRM Plug&Drive pile sections couple together without any welding, for up to 250 linear metres of pile per rig per day, depending on pile diameter and soil. Once installed and the driving set is verified, the pile is cut to level, so pilecap construction and steel fixing can follow straight away.

  • Easier on site

    Light, commercially available plant: a 30-ton excavator with a hydraulic hammer. No spoil is generated, because the soil is displaced. Vibration is minimal, and piles can be installed as close as 40 cm from existing buildings and foundations.

  • Lower cost

    No large, expensive piling rig, no cost of carting spoil away and no waste: the trimmed cut-off starts the next pile.

Key differences: each conventional bored / cfa pile step, and what the TRM driven ductile pile does instead
Conventional bored / CFA pileTRM driven pile
Large piling rig and service crane: mobilise and establish30-ton excavator with hydraulic hammer
Auger / bore out the pile shaftPile driven in; the soil is displaced
Temporary casing or support fluid to hold the shaft openNot required
Keep the open pile hole free of waterNot required
Spoil handling, carting and disposalNone: no spoil
Fabricate, lift and place the reinforcement cageNot required: the ductile iron pile section is the pile
Mass concrete placed by tremie into the shaftPile section filled with mortar directly from the truck
Concrete curing (about 7 days)Not required: pilecaps start immediately
Integrity testing of the cast shaftNot applicable: factory-made pile sections
Load tests on selected pilesCapacity shown by driving resistance on every pile
Break back over-pour and trim the pile headCut to level as installed; the offcut starts the next pile
Production: slower, with casing, cage and concrete for every pileUp to 250 m of pile per rig per day, by diameter and soil
Efficient load capacity. A 170 mm TRM pile can carry the same load as a 500 mm diameter bored pile. Sections drawn to the same scale.

03Applications

TRM pile applications

  1. Residential buildings
  2. Commercial & multi-storey buildings
  3. Industrial buildings & warehouses
  4. Data centres
  5. Mining & process plants
  6. Bridges (abutments & piers)
  7. Power & transmission
  8. Silos & tall structures
  9. Solar arrays (PV & CSP)
  10. Slope stabilisation
  11. Soil nailing
  12. Uplift / buoyancy protection
  13. Underpinning & retrofit
  14. Next to existing structures
  15. Retaining walls & excavation support
  16. Noise barrier walls
  17. Flood protection barriers

04Projects

Recent TRM Projects

  • Column starters in formwork and excavated ground beam trenches across the warehouse site at Willow Park Manor.

    Pretoria East, Gauteng

  • Hydraulic hammer on an excavator boom driving ductile iron piles in front of the Kareespruit bridge deck.

    Bela-Bela, Limpopo

  • Aerial view of an excavator with a hydraulic hammer driving a pile in a trenched site beside a boundary wall, with a stack of pile sections on the ground.

    Lynnwood, Gauteng

  • Excavator-mounted hydraulic hammer driving a pile beneath an inclined conveyor gallery beside a tall clad plant structure.

    Delmas, Mpumalanga

  • Excavator with a long boom and hydraulic hammer driving a pile on a gravel platform under a clear sky.

    Rustenburg, North West

  • Excavator with a hydraulic hammer driving a pile in a narrow yard beside the data centre building, next to covered equipment.

    Amanzimtoti, KwaZulu-Natal

  • Excavator with a hydraulic hammer driving a pile with a grout hose attached, in open grassland.

    Bronkhorstspruit, Gauteng

  • Excavator with a hydraulic hammer working at night under floodlights, beside silos and a conveyor gallery in an operating plant.

    Mkhondo, Mpumalanga

  • Excavator with a TRM hydraulic hammer driving a pile in a foundation trench, with a grout hose attached and school buildings behind.

    Krugersdorp, Gauteng

  • Excavator with a hydraulic hammer driving a pile behind excavated ground beams and column reinforcement.

    Meyerton, Gauteng

  • Concrete columns and scaffolding of the mall frame going up, with a mobile crane on site.

    Ga-Rankuwa, Gauteng

  • Excavator with a hydraulic hammer driving a pile on the boarding house site, with buildings and a hillside behind.

    Northcliff, Gauteng

  • Excavator with a hydraulic hammer driving a pile in a trench, with stacked pile sections beside the excavation.

    Gqeberha, Eastern Cape

  • Deep excavated press pit with rows of pile heads in its floor, a concrete pump boom above and industrial buildings around.

    Gqeberha, Eastern Cape

  • Excavator with a TRM hydraulic hammer driving a pile, with a lattice mast and a site fence behind.

    Mahamba, Eswatini

05Resources

Technical documents

Data sheets, certificates, load tests and driving records. Request a document and we will send it.

Pile section dimensions, cross-section capacities and design recommendations.

06About

TRM Piling (Pty) Ltd

TRM Piling (Pty) Ltd is the sole accredited designer, supplier and installer of the TRM Piling System throughout Southern Africa. We offer turnkey pile design, supply and installation of the TRM Piling System.

The TRM pile is made by Tiroler Rohre GmbH in Hall in Tirol, Austria.

Company
TRM Piling (Pty) Ltd
Accreditation
Sole accredited designer, supplier and installer of the TRM Piling System throughout Southern Africa
Material partner
Tiroler Rohre GmbH, Austria
Registration no.
2016/525648/07
CIDB grading
7CE
B-BBEE
Level 1
Location
Southern Africa

07Contact

Talk to us.

Send us the site information, pile and/or column loads and the geotechnical report, and we'll gladly come back to you with a TRM ductile pile proposal and preliminary pile design for your project.

Structure, approximate loads, ground conditions and programme, as far as you know them.

or drag them here

PDF, DWG, DXF, ZIP, DOCX or images. Up to 10 files, 4.2 MB in total. Larger sets: send a link.

We use your details only to reply. See the privacy notice in the footer.